Belmont High School Phases 1 & 2

Project Value: $7.5 million - $9 million

Select Demo was contracted by SKANSKA USA Building Inc. to perform the asbestos abatement, selective demolition, building separation and structural demolition at the existing Belmont High School to make way for the new high school and middle school. Select Demo’s scope also included protecting the pool and demolishing the structure surrounding it. Phase 2 consisted of the demolition and abatement of the former 190,000 SF, 2-story high school. Demolition scope included the complete demolition of a majority of existing high school, including foundations and footings; complex building separation from section to remain; selective, interior demolition of existing portion of school that remains; complete demolition of 7,000 SF field house. Abatement scope included the removal of VAT/mastic, pipe insulation, roofing, joint compound, plaster, duct insulation, transite panels, windows, doors, fireproofing, ceilings/walls to access asbestos.


Comments


A Premier Full Service Specialty Contracting Company

Main Headquarters

40 Lowell Road Salem, NH 03079

603-386-0391

Boston Office

11 Elkins Street Boston, MA 02127

617-882-7001

Milford Office

69 Eastern Steel Road, Milford, CT 06460

(475) 294-2877

Contact Us

Follow Us

Plymouth Office

34 Main Street Ext. Suite 401 Plymouth, MA 02360

603-386-0391

Email: contact@selectdemo.com

Phone: 603-386-0391

Fax: 603-458-7389

  • Facebook
  • Instagram
  • LinkedIn
Select.png

The Select Group is an Affirmative Action/Equal Opportunity Employer 

Select Demo is proud to be a part of the Select Group of Companies.

Select Demo Logo Square.png
SELECT PAINT AND FINISHES.png
Select Spray - Classic Revamp FLAT GOLD.png
Select-Tile_Final-Logo_Black.png
K-Town Disposal  White Out.png

© 2024 by Select Demo

Privacy Policy  |  Web Design by LetsDesignYourSite.com

bottom of page