Annie Fales Elementary School, Westborough, MA
Annie Fales Elementary School, Westborough, MA
Project Value Range: $650,000 – $800,000 Select Demo was contracted directly by Gilbane Building Company to perform the complete takedown and asbestos abatement of a former 55,000 SF school including bulk removal of 1,150 tons of ACM contaminated masonry and concrete.
.jpeg)
MIT Burton Connor Hall
MIT Burton Connor Hall
Project Value Range: $4.5 million - $5 million Select Demo was contracted by Consigli Construction Co. to perform the selective, interior demolition and asbestos abatement of this 178,000 SF, 6-floor unoccupied dormitory on MIT’s Campus. All joint compound throughout building was asbestos containing material. A major portion of scope included the abatement and removal of 1000+ windows with asbestos caulking. Removal of windows was in tandem with the installers to maintain weather protection....
.jpg)
MA DOT 2 Bridge Replacements Interstate 91 (NB & SB) over the Pan Am Railroad, Greenfield, M
MA DOT 2 Bridge Replacements Interstate 91 (NB & SB) over the Pan Am Railroad, Greenfield, M
Project Value Range: $750,000 - $900,000 Select Demo was contracted directly by MIG Corporation to perform the demolition of two structurally deficient bridges carrying I-91 (both NB & SB) over the Pan Am Railroad in Greenfield, MA, including their superstructures, bituminous wearing surfaces, concrete bridge decks, steel stringers and diaphragms, bearings, railings and bridge utilities. Select’s scope also consisted of the demolition of the two bridges’ substructures consisting of approach...
.jpeg)
BASF, East Newark, NJ
BASF, East Newark, NJ
Project Value Range: $250,000 - $500,000 Select Demo worked directly for BASF, one of the world’s leading chemical companies, to perform asbestos abatement and demolition at an inactive BASF plant. The abatement scope consisted of the removal and disposal of the following asbestos roll-on roofing and asbestos floor tile in two separate, 4,000 SF each garages. The demolition scope entailed the demolition of the two garages, a metal canopy, two guard shacks, fencing and bollards. Select...
.jpg)
Bank of America Phase 3, 100 Federal Street, Boston, MA
Bank of America Phase 3, 100 Federal Street, Boston, MA
Project Value Range: $1.3 million - $1.8 million Select Demo was contracted directly by Consigli Construction to perform demolition and abatement of 3 buildings. The buildings consisted of a two-story parking garage with an office space, a larger two-story parking garage and a one-story retail building. Select’s scope also included the removal of asbestos flooring, pipe installation and a boiler, removal of exterior windows and roof flashing, as well as the cleaning and removal of several...
.jpg)
Former Power Plant, 63 Water Street, Fall River, MA
Former Power Plant, 63 Water Street, Fall River, MA
Project Value Range: $900,000 - $1 million Select Demo was retained to perform the complete demolition and asbestos abatement of this former 45MW coal-fired power plant that powered adjacent textile mills in the city of Fall River. Select’s demolition scope consisted of the complete takedown and abatement of a 40,000 SF brick and concrete structure down to top of the slab with slabs and foundation to remain. Select was responsible for abating and removing four (4) multi-story coal-fired...
.jpg)
B.M.C. Durfee High School, Fall River, MA
B.M.C. Durfee High School, Fall River, MA
Project Value Range: $9 million - $10 million Select Demo was contracted by Suffolk Construction Co. to complete the selective interior and exterior demolition of the 100,000 SF field house, including the removal of all roofing and asbestos façade, as well as the demolition of all interior finishes and second floor locker room curbs and slabs. Select’s scope also included the complete demolition of a 400,000 SF cast-in-place portion of the building, including separations at two ends from the...
.jpg)
MassDOT Gleasondale Road over the Assabet River, Stow, MA
MassDOT Gleasondale Road over the Assabet River, Stow, MA
Project Value Range: $150,000 - $300,000 Select Demo was contracted directly by Kodiak Corporation to perform the two-phased demolition of the MassDOT Gleasondale Road Bridge over the Assabet River after a 2015 inspection showed significant signs of deterioration. The bridge has been partially closed with traffic restrictions since a 2015, and MassDOT determined the bridge required substantial replacement. Select’s scope on this project consisted of the demolition of the bridge...
.jpg)
Super Major – Phase 1, Wood River, IL
Super Major – Phase 1, Wood River, IL
Project Value Range: $1.5 million - $2 million Select Demo was contracted through Arcadis, US, an international engineering and consulting firm, to perform the abatement and demolition of four (4) buildings totaling over 200,000 SF and five (5) 2.8 million gallon diesel and gas tanks for a super-major located in Wood River, IL. The scope of work included the removal of asbestos containing and PCB-containing materials and the cleaning of over 3,000 LF of pipeline prior to the tank demolition.
.jpg)
Fenway Kilmarnock East Building, Boston, MA
Fenway Kilmarnock East Building, Boston, MA
Project Value Range: $800,000 - $1 million Select Demo was contracted directly by Consigli Construction to perform demolition and abatement of 3 buildings. The buildings consisted of a two-story parking garage with an office space, a larger two-story parking garage and a one-story retail building. Select’s scope also included the removal of asbestos flooring, pipe installation and a boiler, removal of exterior windows and roof flashing, as well as the cleaning and removal of several...
.jpg)
Anchorline Sears, 60 1st Street, Cambridge, MA
Anchorline Sears, 60 1st Street, Cambridge, MA
Project Value Range: $2 million - $3 million Select Demo was contracted directly by a general contracting firm to perform 50,000 SF of selective, interior demolition over three floors with additional work in G1, G2 and the penthouse of the former Sears in the Cambridgeside Galleria. Select’s scope also included extensive shoring and the removal of a large portion of the exterior wall framing, as well as the removal of the penthouse and the third level.