MIT Burton Connor Hall

Project Value: $4.5 million- $5 million

Select Demo was contracted by Consigli Construction Co. to perform the selective, interior demolition and asbestos abatement of this 178,000 SF, 6-floor unoccupied dormitory on MIT’s Campus. All joint compound throughout building was asbestos containing material. A major portion of scope included the abatement

and removal of 1000+ windows with asbestos caulking. Removal of windows was in tandem with the installers to

maintain weather protection. Sheet rock demolition was selective as a cost savings to the client; therefore, all other trades received asbestos awareness training, and completed their scope under containment with SDS assistance. SDS provided abatement management for these subcontractors, supplying all necessary PPE and overall management of asbestos paperwork to ensure compliance.


Comments


A Premier Full Service Specialty Contracting Company

Main Headquarters

40 Lowell Road Salem, NH 03079

603-386-0391

Boston Office

11 Elkins Street Boston, MA 02127

617-882-7001

Milford Office

69 Eastern Steel Road, Milford, CT 06460

(475) 294-2877

Contact Us

Follow Us

Plymouth Office

34 Main Street Ext. Suite 401 Plymouth, MA 02360

603-386-0391

Email: contact@selectdemo.com

Phone: 603-386-0391

Fax: 603-458-7389

  • Facebook
  • Instagram
  • LinkedIn
Select.png

The Select Group is an Affirmative Action/Equal Opportunity Employer 

Select Demo is proud to be a part of the Select Group of Companies.

Select Demo Logo Square.png
SELECT PAINT AND FINISHES.png
Select Spray - Classic Revamp FLAT GOLD.png
Select-Tile_Final-Logo_Black.png
K-Town Disposal  White Out.png

© 2024 by Select Demo

Privacy Policy  |  Web Design by LetsDesignYourSite.com

bottom of page