Fisher Hill Elementary School

Project Value Range: $1 million – 1.5 million

Select Demo was contracted by J&J Contractors to perform the selective, interior demolition in this 2-story, 48,000 SF elementary school in Orange, MA. Selective demolition was performed to make way for a new addition to the existing school. Select also performed the asbestos abatement and complete demolition, slab and foundation removal and asbestos abatement of the 1-story, 35,000 SF Dexter Building. The asbestos abatement scope of the Dexter Building included the removal of asbestos glazing, linoleum flooring, adhesives, TSI, VAT, mastics, boiler and duct insulation. Select was contracted to remove all universal waste including: bulbs, ballasts, mercury thermostats, emergency and exit signs within the buildings. This project was completed over three separate phases.


Comments


A Premier Full Service Specialty Contracting Company

Main Headquarters

40 Lowell Road Salem, NH 03079

603-386-0391

Boston Office

11 Elkins Street Boston, MA 02127

617-882-7001

Milford Office

69 Eastern Steel Road, Milford, CT 06460

(475) 294-2877

Contact Us

Follow Us

Plymouth Office

34 Main Street Ext. Suite 401 Plymouth, MA 02360

603-386-0391

Email: contact@selectdemo.com

Phone: 603-386-0391

Fax: 603-458-7389

  • Facebook
  • Instagram
  • LinkedIn
Select.png

The Select Group is an Affirmative Action/Equal Opportunity Employer 

Select Demo is proud to be a part of the Select Group of Companies.

Select Demo Logo Square.png
SELECT PAINT AND FINISHES.png
Select Spray - Classic Revamp FLAT GOLD.png
Select-Tile_Final-Logo_Black.png
K-Town Disposal  White Out.png

© 2024 by Select Demo

Privacy Policy  |  Web Design by LetsDesignYourSite.com

bottom of page