top of page

MIT Schwartzman Bldg. 44, Cambridge, MA

Project Value Range: $500,000 - $1 million


Select Demo was contracted by a construction management/general contracting firm to the perform the complete demolition and abatement of this 20,000 SF brick and concrete building located on an active college campus. Select’s scope included a complete building takedown; removal of asbestos façade; asbestos abatement of VAT/mastic, duct vibration cloth, pipe insulation, window and door caulking, window glazing and roofing materials; cuts, caps and make safe of utilities; demolition of the Cyclotron "Atom Smasher"; and the salvage of a time capsule for MIT. During the project, underground asbestos transite piping was discovered, which was removed and properly disposed of.



Comments


A Premier Full Service Specialty Contracting Company

Main Headquarters

40 Lowell Road Salem, NH 03079

603-386-0391

Boston Office

11 Elkins Street Boston, MA 02127

617-882-7001

Milford Office

69 Eastern Steel Road, Milford, CT 06460

(475) 294-2877

Contact Us

Follow Us

Plymouth Office

34 Main Street Ext. Suite 401 Plymouth, MA 02360

603-386-0391

Email: contact@selectdemo.com

Phone: 603-386-0391

Fax: 603-458-7389

  • Facebook
  • Instagram
  • LinkedIn
Select.png

The Select Group is an Affirmative Action/Equal Opportunity Employer 

Select Demo is proud to be a part of the Select Group of Companies.

Select Demo Logo Square.png
SELECT PAINT AND FINISHES.png
Select Spray - Classic Revamp FLAT GOLD.png
Select-Tile_Final-Logo_Black.png
K-Town Disposal  White Out.png

© 2024 by Select Demo

Privacy Policy  |  Web Design by LetsDesignYourSite.com

bottom of page