

OUR PORTFOLIO
Filters

.jpg)
12 Farnsworth Street, Boston, MA
12 Farnsworth Street, Boston, MA
Project Value Range: $800,000 - $1 million Select Demo was contracted by Suffolk Construction to perform the interior, selective demolition, and asbestos abatement in this occupied 6-story, 56,000 SF commercial building located in the Seaport's Fort Point neighborhood to allow for the conversion into lab/research floorspace. The demolition scope consisted of removal and disposal of all architectural finishes throughout all six floors, including structural slab removal around the wooden,...
.jpeg)
Daniel F. Burns Apartments, Cambridge, MA
Daniel F. Burns Apartments, Cambridge, MA
Project Value Range: $3 million - $4 million Select Demo was contracted directly by Consigli Construction Co. to perform three separate phases of selective, interior demolition and abatement in two occupied, residential Cambridge Housing Authority apartment buildings both being six floors and 80,000 SF. Demolition scope consisted of the removal of walls, windows, flooring, doors, millwork, appliances, railings, curtain walls/partitions, HVAC items, plumbing fixtures and electrical items,...
.jpeg)
Fisher Hill Elementary School
Fisher Hill Elementary School
Project Value Range: $1 million – 1.5 million Select Demo was contracted by J&J Contractors to perform the selective, interior demolition in this 2-story, 48,000 SF elementary school in Orange, MA. Selective demolition was performed to make way for a new addition to the existing school. Select also performed the asbestos abatement and complete demolition, slab and foundation removal and asbestos abatement of the 1-story, 35,000 SF Dexter Building. The asbestos abatement scope of the Dexter...
.jpg)
50-60 Sylvan Street, Waltham, MA
50-60 Sylvan Street, Waltham, MA
Project Value Range: $4 - $5 million Select Demo was contracted directly by DPR to perform the interior demolition of this 3-story, 200,000 SF commercial building (Bldg. 50), as well as the interior demolition and asbestos abatement of a 2-story L-shaped building (Bldg. 60). A large mechanical space was completely demolished in Bldg. 60, along with loading dock and building entryways. The 2-level connector between Bldg. 50 and 60 was al-so completely demolished. Select’s abatement scope...

.jpg)
.jpg)
.jpeg)
.jpeg)
.png)
.jpg)
.jpeg)
.jpg)